Cold mix is a quick, temporary fill that you can use at normal temperatures, so it's good for making a hazard safe fast. Hot mix is heated asphalt, placed and compacted into a properly prepared hole, and it's what you use for a permanent repair.
Cold mix
Cold mix is premixed asphalt that stays workable at normal temperatures. A crew can fill the hole and compact it with no heating or mixing on site, so the hazard is gone quickly, often the same day.
It won’t carry traffic for years. It doesn’t bond to the surrounding pavement or compact the way hot mix does, so it softens and wears out under regular traffic.
Hot mix
Hot mix is heated asphalt, placed while it’s hot and compacted into a hole that’s been prepared properly. For a permanent repair that means a clean saw-cut edge, the failed material taken out, the base compacted, then the hot mix laid, compacted and the edges sealed. Done that way, it performs like the road around it.
Which one to use
- An urgent hazard: cold mix to make it safe now, then book the permanent repair
- A planned repair, or a hole that keeps coming back: hot mix, with the base fixed properly
- Lots of damage across an area: resurfacing may be the better answer, see patching vs full resurfacing
Compaction matters more than the mix
Even the right mix fails if it isn’t compacted in layers over a sound base. That’s why a repair can look fine on day one and fail by the second wet season. It’s also why the order of make-safe and permanent work matters, see make-safe vs permanent reinstatement.
Common questions
What is the difference between cold mix and hot mix?
Cold mix is premixed asphalt you can place without heating, so it's quick but doesn't last. Hot mix is heated asphalt placed and compacted while hot, which gives a stronger repair that bonds to the surrounding pavement.
How long does a cold mix repair last?
It depends on the traffic, the weather and the size of the hole, but it's a temporary measure, not a permanent surface. Left in place too long it breaks down and the hole reopens.
Is hot mix always better?
For a permanent repair, yes. But hot mix needs preparation and a crew on site, so for an urgent hazard the usual move is cold mix first and the hot mix repair scheduled after.
Need this sorted on your site?
Tell us where it is and what's going on. We'll call you back within 24 hours, or call now if it's urgent.
