What we do

Four capabilities. One accountable crew.

From the first saw-cut to the final seal, we handle every stage of reinstatement in-house, so councils, gas and plumbing contractors, and principal contractors are dealing with one team, not three subcontractors.

01

Asphalt Repairs

Patching, hot-mix placement and trench reinstatement for roads and driveways, matched to the existing pavement so the repair performs the same as the surrounding surface.

CouncilsGas & plumbingPrincipal contractorsPrivate sites
  • Pothole and edge repairs
  • Hot-mix resurfacing
  • Trench reinstatement after gas, water or plumbing works
  • Driveway and car park patching

How we approach it

1

Assess the pavement

Confirm the extent of damage and the correct mix and thickness for the road classification.

2

Saw-cut a clean edge

A straight, clean cut gives the new asphalt a stable edge to bond against.

3

Excavate and compact the base

Removing failed material and compacting the base is what determines whether the patch lasts.

4

Lay, compact and seal

Hot-mix is placed, compacted to specification, and the edge sealed against water ingress.

02

Concrete Works

Reinstating footpaths, kerbs, channels and crossovers to council specification, with the correct drainage fall, alignment and finish every inspector checks for.

CouncilsPrincipal contractorsPrivate sites
  • Footpath reinstatement
  • Kerb and channel
  • Vehicle crossovers
  • Finish matched to council specification

How we approach it

1

Setout and formwork

Correct alignment and drainage fall are set before a single bag of concrete is mixed.

2

Prepare the base

Excavate and compact to the depth required for the specific footpath or kerb profile.

3

Pour to specification

Correct mix, thickness and joint placement, checked against council requirements.

4

Finish and cure

A consistent finish matched to spec, with appropriate curing time before the site reopens.

Not sure which one you need?

Tell us the site and what's going on, and we'll point you to the right fix. No obligation.

03

Site Preparation

The groundwork that determines whether a reinstatement lasts. Done properly, before a single tonne of asphalt or bag of concrete arrives.

CouncilsGas & plumbingPrincipal contractors
  • Excavation
  • Saw-cutting
  • Base compaction
  • Surface profiling

How we approach it

1

Assess the site

Confirm depth, existing pavement condition and any access constraints.

2

Saw-cut the boundary

A clean, defined edge for whatever reinstatement follows.

3

Excavate to depth

Remove failed or unsuitable material to the level the job requires.

4

Compact in layers

Base compaction in proper layers is the single biggest factor in how long a reinstatement lasts.

04

Temporary & Permanent Fixes

Make-safe works to remove a hazard fast, followed by a permanent restoration scheduled around your site, and ongoing facility management agreements for recurring work.

CouncilsGas & plumbingPrincipal contractorsFacility management
  • Emergency make-safe response
  • Scheduled permanent works
  • Ongoing facility management agreements

How we approach it

1

Assess the hazard

Determine whether a site needs an immediate response or can be scheduled as planned works.

2

Make safe

Remove the immediate risk, often same-day, so the site is safe while permanent works are arranged.

3

Schedule the permanent fix

Book in the full reinstatement as soon as site access and materials allow.

4

Complete to standard

The permanent reinstatement is finished to council specification, closing the job out properly.