Four capabilities. One accountable crew.
From the first saw-cut to the final seal, we handle every stage of reinstatement in-house, so councils, gas and plumbing contractors, and principal contractors are dealing with one team, not three subcontractors.
Asphalt Repairs
Patching, hot-mix placement and trench reinstatement for roads and driveways, matched to the existing pavement so the repair performs the same as the surrounding surface.
- Pothole and edge repairs
- Hot-mix resurfacing
- Trench reinstatement after gas, water or plumbing works
- Driveway and car park patching
Dealing with a pothole? See how we repair potholes.
How we approach it
Assess the pavement
Confirm the extent of damage and the correct mix and thickness for the road classification.
Saw-cut a clean edge
A straight, clean cut gives the new asphalt a stable edge to bond against.
Excavate and compact the base
Removing failed material and compacting the base is what determines whether the patch lasts.
Lay, compact and seal
Hot-mix is placed, compacted to specification, and the edge sealed against water ingress.
Concrete Works
Reinstating footpaths, kerbs, channels and crossovers to council specification, with the correct drainage fall, alignment and finish every inspector checks for.
- Footpath reinstatement
- Kerb and channel
- Vehicle crossovers
- Finish matched to council specification
How we approach it
Setout and formwork
Correct alignment and drainage fall are set before a single bag of concrete is mixed.
Prepare the base
Excavate and compact to the depth required for the specific footpath or kerb profile.
Pour to specification
Correct mix, thickness and joint placement, checked against council requirements.
Finish and cure
A consistent finish matched to spec, with appropriate curing time before the site reopens.
Not sure which one you need?
Tell us the site and what's going on, and we'll point you to the right fix. No obligation.
Site Preparation
The groundwork that determines whether a reinstatement lasts. Done properly, before a single tonne of asphalt or bag of concrete arrives.
- Excavation
- Saw-cutting
- Base compaction
- Surface profiling
How we approach it
Assess the site
Confirm depth, existing pavement condition and any access constraints.
Saw-cut the boundary
A clean, defined edge for whatever reinstatement follows.
Excavate to depth
Remove failed or unsuitable material to the level the job requires.
Compact in layers
Base compaction in proper layers is the single biggest factor in how long a reinstatement lasts.
Temporary & Permanent Fixes
Make-safe works to remove a hazard fast, followed by a permanent restoration scheduled around your site, and ongoing facility management agreements for recurring work.
- Emergency make-safe response
- Scheduled permanent works
- Ongoing facility management agreements
Curious how make-safe and permanent reinstatement fit together? Read the full explanation.
How we approach it
Assess the hazard
Determine whether a site needs an immediate response or can be scheduled as planned works.
Make safe
Remove the immediate risk, often same-day, so the site is safe while permanent works are arranged.
Schedule the permanent fix
Book in the full reinstatement as soon as site access and materials allow.
Complete to standard
The permanent reinstatement is finished to council specification, closing the job out properly.
Have a site that needs any of this?
Tell us the location and job type. We'll call you back within 24 hours, sooner if it's urgent.
